Mostrar el registro sencillo del ítem
dc.contributor.author | Gómez Palacin, Carlos | |
dc.contributor.author | Pitarch Pérez, José Luis | |
dc.contributor.author | Jasch, Christian | |
dc.contributor.author | Méndez, Carlos Alberto | |
dc.contributor.author | Prada Moraga, César de | |
dc.date.accessioned | 2018-01-06T10:14:59Z | |
dc.date.available | 2018-01-06T10:14:59Z | |
dc.date.issued | 2018 | |
dc.identifier.citation | Computers & Chemical Engineering, February 2018, Vol. 110, P. 140-151. | es |
dc.identifier.issn | 0098-1354 | es |
dc.identifier.uri | http://uvadoc.uva.es/handle/10324/27940 | |
dc.description | Producción Científica | es |
dc.description.abstract | This work aims to reduce the global resource consumption in an industrial evaporation network by better tasks management and coordination. The network works in continuous, processing some products in several evaporation plants, so optimal load allocation and product-plant assignment problems appear. The plants have different features (capacity, equipment, etc.) and their performance is affected by fouling inside the heat exchangers and external factors. Hereby, the optimizer has to decide when maintenance operations have to be triggered. Therefore, a mixed production/maintenance scheduling problem arises. The plant behavior is approximated by surrogate linear models obtained experimentally, allowing thus the use of mixed-integer linear optimization routines to obtain solutions in acceptable time. Furthermore, uncertainty in the weather forecast and in the production plan is also considered via a two-stage stochastic programming approach. Finally, a trade-off analysis between other objectives of interest is given to support the decision maker. | es |
dc.format.mimetype | application/pdf | es |
dc.language.iso | eng | es |
dc.publisher | Elsevier | es |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-sa/4.0/ | |
dc.subject.classification | Production scheduling | es |
dc.subject.classification | Stochastic optimization | es |
dc.subject.classification | Integration | es |
dc.subject.classification | Fouling | es |
dc.subject.classification | Maintenance prediction | es |
dc.subject.classification | Similarity index | es |
dc.title | Robust integrated production-maintenance scheduling for an evaporation network | es |
dc.type | info:eu-repo/semantics/article | es |
dc.rights.holder | Elsevier | es |
dc.identifier.doi | https://doi.org/10.1016/j.compchemeng.2017.12.005 | es |
dc.relation.publisherversion | https://doi.org/10.1016/j.compchemeng.2017.12.005 | es |
dc.identifier.publicationfirstpage | 140 | es |
dc.identifier.publicationlastpage | 151 | es |
dc.identifier.publicationtitle | Robust integrated production-maintenance scheduling for an evaporation network | es |
dc.identifier.publicationvolume | 110 | es |
dc.peerreviewed | SI | es |
dc.description.project | Spanish Government with project INOPTCON (MINECO/FEDER DPI2015-70975-P). | es |
dc.relation.projectID | info:eu-repo/grantAgreement/EC/H2020/723575 | |
dc.rights | Attribution-NonCommercial-ShareAlike 4.0 International |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
