• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Listar

    Todo UVaDOCComunidadesPor fecha de publicaciónAutoresMateriasTítulos

    Mi cuenta

    Acceder

    Estadísticas

    Ver Estadísticas de uso

    Compartir

    Ver ítem 
    •   UVaDOC Principal
    • PRODUCCIÓN CIENTÍFICA
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Ver ítem
    •   UVaDOC Principal
    • PRODUCCIÓN CIENTÍFICA
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Ver ítem
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:https://uvadoc.uva.es/handle/10324/65286

    Título
    A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP)
    Autor
    Villafáñez Cardeñoso, Félix AntonioAutoridad UVA
    Poza Garcia, David JesúsAutoridad UVA Orcid
    López Paredes, AdolfoAutoridad UVA Orcid
    Pajares Gutiérrez, JavierAutoridad UVA Orcid
    del Olmo, Ricardo
    Año del Documento
    2019
    Editorial
    Springer Berlin Heidelberg
    Descripción
    Producción Científica
    Documento Fuente
    Soft Computing, 23(10), 3465-3479
    Resumen
    This paper presents a novel algorithm to solve the multi-project scheduling problem with resource constraints (RCMPSP). The algorithm was tested with all the problems proposed in the multi-project scheduling problem library, which is the main reference to benchmark RCMPSP algorithms. Our analysis of the results demonstrates that this algorithm, in spite of its simplicity, outperforms other algorithms published in the library in 16% of the cases and holds the best result in 27% of the cases. These results, along with the fact that this is a general-purpose algorithm, make it a good choice to deal with limited time and resources in portfolio management.
    Palabras Clave
    Project management
    Project scheduling
    Portfolio management
    Multi-project scheduling
    RCMPSP
    MPSPLib
    Revisión por pares
    SI
    DOI
    10.1016/j.ijproman.2015.06.012
    Patrocinador
    This research has been partially financed by the project ABARNET (Agent-Based Algorithms for Railway NETworks optimization) financed by the Spanish Ministry of Economy, Industry and Competitiveness, with Grant DPI2016-78902-P, and the Computational Models for Industrial Management (CM4IM) project, funded by the Valladolid University General Foundation.
    Version del Editor
    https://link.springer.com/article/10.1007/s00500-017-3003-y
    Idioma
    eng
    URI
    https://uvadoc.uva.es/handle/10324/65286
    Tipo de versión
    info:eu-repo/semantics/submittedVersion
    Derechos
    restrictedAccess
    Aparece en las colecciones
    • DEP53 - Artículos de revista [97]
    Mostrar el registro completo del ítem
    Ficheros en el ítem
    Nombre:
    A generic heuristic.pdf
    Tamaño:
    1.523Mb
    Formato:
    Adobe PDF
    Thumbnail
    Visualizar/Abrir

    Universidad de Valladolid

    Powered by MIT's. DSpace software, Version 5.10