• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Ricerca

    Tutto UVaDOCArchiviData di pubblicazioneAutoriSoggettiTitoli

    My Account

    Login

    Estadísticas

    Ver Estadísticas de uso

    Compartir

    Mostra Item 
    •   UVaDOC Home
    • PRODUZIONE SCIENTIFICA
    • Institutos de Investigación
    • Instituto Universitario de Urbanística
    • IUU - Capítulos de Monografías
    • Mostra Item
    •   UVaDOC Home
    • PRODUZIONE SCIENTIFICA
    • Institutos de Investigación
    • Instituto Universitario de Urbanística
    • IUU - Capítulos de Monografías
    • Mostra Item
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:https://uvadoc.uva.es/handle/10324/68425

    Título
    The Reconstruction Plan of Genoa. The Plan of ‘Missed Opportunities’
    Autor
    Gastaldi, Francesco
    Camerin, FedericoAutoridad UVA
    Año del Documento
    2024
    Editorial
    Thelem
    Descripción
    Producción Científica
    Documento Fuente
    Gastaldi, Francesco, CAMERIN FEDERICO (2024). The Reconstruction Plan of Genoa. The Plan of ‘Missed Opportunities’. En A. Diener, P. Dieudonné, H.-G. Lippert, S. de Puineuf, K., Z. H. Zemánková (Eds.), Res Urbanae. A look at cities under reconstruction (pp. 69-79). Thelem: Dresden-Munich. ISBN: 978–3–95908–660–8
    Abstract
    This research provides a reflection on the doctrine of reconstruction in the Italian city of Genoa after WWII. The aim is to expand knowledge on the role of the 1945-to-1950 Reconstruction Plan of Genoa’s centre and Sampierdarena (Piano di Ricostruzione; PR) and the subsequent 1946-to-1959 General Master Plan (Piano Regolatore Generale; PRG) to foster the city-making process during the Reconstruction period (1945 to 1960). The idea is to open a debate on the real impacts of Genoa’s PRs, which have been insufficiently studied due to the poor materials released at that epoque, thus creating the proper basis to open a new research path. This work is part of the wider interests of the authors in the post-1945 city-making process of Genoa.2 This particular subject has not yet been addressed from the specific angle of Reconstruction, which is why the work does not so much present research results as rather asks questions on the basis of the new information provided. [parte del texto].
    Materias Unesco
    3329 Planificación Urbana
    Palabras Clave
    Regeneración urbana
    Reconstruction plan
    Plan de reconstrucción
    Génova
    Genoa
    ISBN
    978–3–95908–660–8
    Version del Editor
    https://res-urbanae.eu/publication-en/
    Idioma
    eng
    URI
    https://uvadoc.uva.es/handle/10324/68425
    Tipo de versión
    info:eu-repo/semantics/publishedVersion
    Derechos
    openAccess
    Aparece en las colecciones
    • IUU - Capítulos de Monografías [18]
    Mostra tutti i dati dell'item
    Files in questo item
    Nombre:
    Reconstruction-plan-Genoa.pdf
    Tamaño:
    18.61Mb
    Formato:
    Adobe PDF
    Thumbnail
    Mostra/Apri
    Attribution-NonCommercial-NoDerivatives 4.0 InternacionalLa licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 Internacional

    Universidad de Valladolid

    Powered by MIT's. DSpace software, Version 5.10