Project Tightness (PT): A Complementary Topological Indicator for Explaining Project Schedule Behaviour
Año del Documento
2026-04
Documento Fuente
Proceedings of the PMS2026 Conference (pp. 84–87).
Resumen
The paper introduces Project Tightness (PT) as a topological indicator that captures the temporal tension of project networks and complements the traditional Series–Parallel (SP) index. Through simulation studies, the results show that PT helps explain differences in variance propagation and control performance among projects with similar structures. Overall, combining PT and SP provides a more complete understanding of project behaviour under uncertainty.
Palabras Clave
Project Tightness, Series-Parallel Index, Network Topology, Project Control.
Revisión por pares
SI
Patrocinador
This project has been partially funded by the Regional Government of Castile and Leon (Spain) under the Regional Accredited Research Groups Support Program, with grant VA042G2
Version del Editor
Idioma
spa
Tipo de versión
info:eu-repo/semantics/publishedVersion
Derechos
openAccess
Aparece en las colecciones
Ficheros en el ítem
La licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 Internacional