<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-04-14T15:13:56Z</responseDate><request verb="GetRecord" identifier="oai:uvadoc.uva.es:10324/45100" metadataPrefix="mods">https://uvadoc.uva.es/oai/request</request><GetRecord><record><header><identifier>oai:uvadoc.uva.es:10324/45100</identifier><datestamp>2025-02-20T12:05:26Z</datestamp><setSpec>com_10324_38</setSpec><setSpec>col_10324_852</setSpec></header><metadata><mods:mods xmlns:mods="http://www.loc.gov/mods/v3" xmlns:doc="http://www.lyncode.com/xoai" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-1.xsd">
<mods:name>
<mods:namePart>Curto Lorenzo, David</mods:namePart>
</mods:name>
<mods:extension>
<mods:dateAvailable encoding="iso8601">2021-01-21T14:40:07Z</mods:dateAvailable>
</mods:extension>
<mods:extension>
<mods:dateAccessioned encoding="iso8601">2021-01-21T14:40:07Z</mods:dateAccessioned>
</mods:extension>
<mods:originInfo>
<mods:dateIssued encoding="iso8601">2020</mods:dateIssued>
</mods:originInfo>
<mods:identifier type="uri">http://uvadoc.uva.es/handle/10324/45100</mods:identifier>
<mods:abstract>La Gestión del Riesgo se ha convertido en un tema de interés general&#xd;
dentro de la administración y dirección, y especialmente en la dirección y&#xd;
gestión de proyectos o Project Management. Sin embargo, no existe un&#xd;
consenso generalizado en cuanto a los conceptos de riesgo e incertidumbre.&#xd;
Una amplia revisión literaria nos ha permitido identificar cuatro tipos de&#xd;
incertidumbre: estocástica, aleatoria, epistémica y ontológica. Para realizar una&#xd;
buena gestión del riesgo, es imprescindible el uso de las técnicas y&#xd;
herramientas adecuadas. El objetivo de este trabajo es presentar un sumario&#xd;
de las herramientas y técnicas recomendadas para ser aplicadas a cada tipo&#xd;
de incertidumbre</mods:abstract>
<mods:abstract>Risk Management is an emerging topic of interest in Management&#xd;
literature in general, and especially in the Project Management discipline.&#xd;
Nonetheless, there is no consensus about the concept of risk. A broad review&#xd;
of the literature let us identify four types of uncertainty: stochastic, aleatoric,&#xd;
epistemic and ontological. Successful Risk Management requires applying the&#xd;
appropriate techniques and tools. The aim of this paper is to present a synthesis&#xd;
of the tools and techniques, which must be applied to each type of uncertainty</mods:abstract>
<mods:language>
<mods:languageTerm>spa</mods:languageTerm>
</mods:language>
<mods:accessCondition type="useAndReproduction">info:eu-repo/semantics/openAccess</mods:accessCondition>
<mods:accessCondition type="useAndReproduction">http://creativecommons.org/licenses/by-nc-nd/4.0/</mods:accessCondition>
<mods:accessCondition type="useAndReproduction">Attribution-NonCommercial-NoDerivatives 4.0 Internacional</mods:accessCondition>
<mods:titleInfo>
<mods:title>Herramientas y Técnicas en la Gestión de la Incertidumbre</mods:title>
</mods:titleInfo>
<mods:genre>info:eu-repo/semantics/bachelorThesis</mods:genre>