<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-04-22T21:28:53Z</responseDate><request verb="GetRecord" identifier="oai:uvadoc.uva.es:10324/84253" metadataPrefix="marc">https://uvadoc.uva.es/oai/request</request><GetRecord><record><header><identifier>oai:uvadoc.uva.es:10324/84253</identifier><datestamp>2026-04-21T19:21:32Z</datestamp><setSpec>com_10324_1180</setSpec><setSpec>com_10324_931</setSpec><setSpec>com_10324_894</setSpec><setSpec>col_10324_1375</setSpec></header><metadata><record xmlns="http://www.loc.gov/MARC21/slim" xmlns:doc="http://www.lyncode.com/xoai" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:dcterms="http://purl.org/dc/terms/" xsi:schemaLocation="http://www.loc.gov/MARC21/slim http://www.loc.gov/standards/marcxml/schema/MARC21slim.xsd">
<leader>00925njm 22002777a 4500</leader>
<datafield tag="042" ind1=" " ind2=" ">
<subfield code="a">dc</subfield>
</datafield>
<datafield tag="720" ind1=" " ind2=" ">
<subfield code="a">Acebes Senovilla, Fernando</subfield>
<subfield code="e">author</subfield>
</datafield>
<datafield tag="720" ind1=" " ind2=" ">
<subfield code="a">Tao, Liangyan</subfield>
<subfield code="e">author</subfield>
</datafield>
<datafield tag="720" ind1=" " ind2=" ">
<subfield code="a">Sobrino, Manuel</subfield>
<subfield code="e">author</subfield>
</datafield>
<datafield tag="720" ind1=" " ind2=" ">
<subfield code="a">Pajares Gutiérrez, Javier</subfield>
<subfield code="e">author</subfield>
</datafield>
<datafield tag="260" ind1=" " ind2=" ">
<subfield code="c">2026-04</subfield>
</datafield>
<datafield tag="520" ind1=" " ind2=" ">
<subfield code="a">The paper introduces Project Tightness (PT) as a topological indicator that captures the temporal tension of project networks and complements the traditional Series–Parallel (SP) index. Through simulation studies, the results show that PT helps explain differences in variance propagation and control performance among projects with similar structures. Overall, combining PT and SP provides a more complete understanding of project behaviour under uncertainty.</subfield>
</datafield>
<datafield tag="024" ind2=" " ind1="8">
<subfield code="a">Proceedings of the PMS2026 Conference (pp. 84–87).</subfield>
</datafield>
<datafield tag="024" ind2=" " ind1="8">
<subfield code="a">https://uvadoc.uva.es/handle/10324/84253</subfield>
</datafield>
<datafield tag="024" ind2=" " ind1="8">
<subfield code="a">84</subfield>
</datafield>
<datafield tag="024" ind2=" " ind1="8">
<subfield code="a">87</subfield>
</datafield>
<datafield tag="024" ind2=" " ind1="8">
<subfield code="a">Proceedings of the PMS2026 Conference. Toulouse - France</subfield>
</datafield>
<datafield tag="245" ind1="0" ind2="0">
<subfield code="a">Project Tightness (PT): A Complementary Topological Indicator for Explaining Project Schedule Behaviour</subfield>
</datafield>
</record></metadata></record></GetRecord></OAI-PMH>