RT info:eu-repo/semantics/article T1 Robust integrated production-maintenance scheduling for an evaporation network A1 Gómez Palacín, Carlos A1 Pitarch Pérez, José Luis A1 Jasch, Christian A1 Méndez, Carlos Alberto A1 Prada Moraga, César de K1 Production scheduling K1 Stochastic optimization K1 Integration K1 Fouling K1 Maintenance prediction K1 Similarity index AB This work aims to reduce the global resource consumption in an industrial evaporation network by better tasks management and coordination. The network works in continuous, processing some products in several evaporation plants, so optimal load allocation and product-plant assignment problems appear. The plants have different features (capacity, equipment, etc.) and their performance is affected by fouling inside the heat exchangers and external factors. Hereby, the optimizer has to decide when maintenance operations have to be triggered. Therefore, a mixed production/maintenance scheduling problem arises. The plant behavior is approximated by surrogate linear models obtained experimentally, allowing thus the use of mixed-integer linear optimization routines to obtain solutions in acceptable time. Furthermore, uncertainty in the weather forecast and in the production plan is also considered via a two-stage stochastic programming approach. Finally, a trade-off analysis between other objectives of interest is given to support the decision maker. PB Elsevier SN 0098-1354 YR 2018 FD 2018 LK http://uvadoc.uva.es/handle/10324/27940 UL http://uvadoc.uva.es/handle/10324/27940 LA eng NO Computers & Chemical Engineering, February 2018, Vol. 110, P. 140-151. NO Producción Científica DS UVaDOC RD 19-nov-2024