RT info:eu-repo/semantics/masterThesis T1 Viable system model and the project management A1 Castillo Rivera, Salvador A2 Universidad de Valladolid. Escuela de Ingenierías Industriales K1 Gestión de proyectos AB The application of Viable System Model to project management structure has been hardly done in the literature. This research aims to fill the lack between the projects management and the analysis of VSM by using the guide to the project management body of knowledge (PMBOK), sixth edition, as a diagnostic analysis tool for assessing the viability. The research is based on a modified Viable System Model for the analysis of systems. The research establishes how PMBOK can cover the requirements for an application of Viable System Model in the project management field. The research is focused on to determine the significance and potential use of PMBOK as a tool, which methodology might link Viable System Model and the project management. YR 2019 FD 2019 LK http://uvadoc.uva.es/handle/10324/37246 UL http://uvadoc.uva.es/handle/10324/37246 LA eng NO Departamento de Organización de Empresas y Comercialización e Investigación de Mercados DS UVaDOC RD 14-jul-2024