TY - JOUR AU - Salamanca Parra, Jacobo Manuel AU - Álvarez Silva, Óscar AU - Tadeo Rico, Fernando Juan PY - 2019 SN - 0360-5442 UR - http://uvadoc.uva.es/handle/10324/37900 AB - The Magdalena River mouth in Colombia is studied as a candidate site for a renewable power plant via osmotic energy technology, using pressure retarded osmosis. This power generation plant would operate through the controlled mix of two flows with... LA - eng TI - Potential and analysis of an osmotic power plant in the Magdalena River using experimental field-data DO - 10.1016/j.energy.2019.05.048 ER -