• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Navegar

    Todo o repositórioComunidadesPor data do documentoAutoresAssuntosTítulos

    Minha conta

    Entrar

    Estatística

    Ver as estatísticas de uso

    Compartir

    Ver item 
    •   Página inicial
    • PRODUÇÃO CIENTÍFICA
    • Departamentos
    • Dpto. Ingeniería Agrícola y Forestal
    • DEP42 - Artículos de revista
    • Ver item
    •   Página inicial
    • PRODUÇÃO CIENTÍFICA
    • Departamentos
    • Dpto. Ingeniería Agrícola y Forestal
    • DEP42 - Artículos de revista
    • Ver item
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:https://uvadoc.uva.es/handle/10324/65660

    Título
    ‘Green’, rammed earth check dams: A proposal to restore gullies under low rainfall erosivity and runoff conditions
    Autor
    Galicia, S.
    Navarro Hevia, JoaquínAutoridad UVA Orcid
    Martínez Rodríguez, AndrésAutoridad UVA Orcid
    Mongil Manso, J.
    Santibáñez, J.
    Año del Documento
    2019-08
    Editorial
    Elsevier
    Descripción
    Producción Científica
    Documento Fuente
    Science of The Total Environment, agosto 2019, vol. 676, p. 584-594
    Resumo
    Gully restoration check dams are usually made with construction materials and have a permanent impact on the landscape. Although earthen dams have not been used to restore gullies, they have been used around the world for water reservoirs and to control flooding. Here, we propose ‘green’, rammed earth check dams as a better environmental solution to restore gullies and integrate check dams in the natural landscape. This new design of earthen dam aimed at achieving a reduction in construction volume, as we propose a straight profile for the earthen wall upstream and an impervious core made of rammed earth wall. Moreover, the sloping, revegetated profile downstream enables integrating the check dam into the landscape, while the rammed earth wall allows the use of traditional materials and construction methods better adapted to the natural environment. We also present the design process, calculating its stability versus overturning, sliding and ground resistance for its weight. In addition, we compare the construction costs and carbon footprint of the rammed earth check dam with those of other frequently used check dams, such as concrete or gabion check dams. It shows that although rammed earth check dams may have a greater cost (>21%), they also have a sink effect of 23,639.36 kg CO2 due to the vegetation cover on the downstream embankment. This work shows their feasibility in gullied areas and ravines of fine textured soils under low runoff and rainfall erosivity conditions.
    ISSN
    0048-9697
    Revisión por pares
    SI
    DOI
    10.1016/j.scitotenv.2019.04.189
    Version del Editor
    https://www.sciencedirect.com/science/article/pii/S0048969719317218
    Idioma
    spa
    URI
    https://uvadoc.uva.es/handle/10324/65660
    Tipo de versión
    info:eu-repo/semantics/publishedVersion
    Derechos
    embargoedAccess
    Aparece en las colecciones
    • DEP42 - Artículos de revista [291]
    Mostrar registro completo
    Arquivos deste item
    Nombre:
    Articulo1.pdfEmbargado hasta: 2099-12-31
    Tamaño:
    2.158Mb
    Formato:
    Adobe PDF
    Descripción:
    Artículo principal
    Visualizar/Abrir

    Universidad de Valladolid

    Powered by MIT's. DSpace software, Version 5.10