• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Stöbern

    Gesamter BestandBereicheErscheinungsdatumAutorenSchlagwortenTiteln

    Mein Benutzerkonto

    Einloggen

    Statistik

    Benutzungsstatistik

    Compartir

    Dokumentanzeige 
    •   UVaDOC Startseite
    • WISSENSCHAFTLICHE ARBEITEN
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Otros Documentos (Monografías, Informes, Memorias, Documentos de Trabajo, etc)
    • Dokumentanzeige
    •   UVaDOC Startseite
    • WISSENSCHAFTLICHE ARBEITEN
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Otros Documentos (Monografías, Informes, Memorias, Documentos de Trabajo, etc)
    • Dokumentanzeige
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:https://uvadoc.uva.es/handle/10324/78733

    Título
    Project Tightness Index (PT): A Concise Metric of Schedule Tightness
    Autor
    Acebes, Fernando
    Pajares, Javier
    Año del Documento
    2025-10-16
    Descripción
    Producción Científica
    Zusammenfassung
    In this paper, we introduce Project Tightness (PT), a new topological indicator designed to assess the structural tightness of project schedules. The indicator combines information on the project’s network structure and activity durations, yielding a normalised measure on the [0,1] scale. PT quantifies the degree of schedule compression—or “tightness”—by integrating both activity floats and the configuration of the project’s critical structure. Unlike the classic XSLACK-R (average relative slack per activity), proposed by Patterson in Project Scheduling: The Effects of Problem Structure on Heuristic Performance (1976), the new indicator normalises total slack by the number of activities that do not belong to the dominant critical path (i.e., the critical path with the greatest number of activities). In doing so, PT penalises the presence of parallel critical branches—that is, critical activities outside the longest critical path—an aspect not captured by XSLACK-R. The paper formally develops the indicator’s definition and fundamental properties (boundedness, time-scale invariance, and monotonicity) and presents several illustrative examples to support its interpretation and practical use.
    Palabras Clave
    Topological Indicator
    Project Tightness
    Project Control
    Project Scheduling
    Idioma
    spa
    URI
    https://uvadoc.uva.es/handle/10324/78733
    Tipo de versión
    info:eu-repo/semantics/draft
    Derechos
    openAccess
    Aparece en las colecciones
    • DEP53 - Otros Documentos (Monografías, Informes, Memorias, Documentos de Trabajo, etc) [8]
    Zur Langanzeige
    Dateien zu dieser Ressource
    Nombre:
    working paper Acebes & Pajares (2025).pdf
    Tamaño:
    358.4Kb
    Formato: