• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Listar

    Todo UVaDOCComunidadesPor fecha de publicaciónAutoresMateriasTítulos

    Mi cuenta

    Acceder

    Estadísticas

    Ver Estadísticas de uso

    Compartir

    Ver ítem 
    •   UVaDOC Principal
    • PRODUCCIÓN CIENTÍFICA
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Ver ítem
    •   UVaDOC Principal
    • PRODUCCIÓN CIENTÍFICA
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Ver ítem
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:https://uvadoc.uva.es/handle/10324/65385

    Título
    A unified nomenclature for project scheduling problems (RCPSP and RCMPSP)
    Autor
    Villafáñez Cardeñoso, Félix AntonioAutoridad UVA
    Poza Garcia, David JesúsAutoridad UVA Orcid
    López Paredes, AdolfoAutoridad UVA Orcid
    Pajares Gutiérrez, JavierAutoridad UVA Orcid
    Año del Documento
    2018
    Documento Fuente
    Dirección y Organización, 64, 56-60.
    Resumen
    We present a unified formulation for the single and the multi-project scheduling problems (RCPSP and RCMPSP, respectively). Although this issue had been widely described in the literature, we found that, to our knowledge, the nomenclature used for the formulation of both problems has never been completely unified, which has traditionally hindered a comparison between approaches. For this reason, in this article we propose a unified nomenclature for the formulation of both problems
    Palabras Clave
    Management
    Project Scheduling
    Multi-project Scheduling
    RCPSP
    RCMPSP
    ISSN
    1132-175X
    Revisión por pares
    SI
    DOI
    10.37610/dyo.v0i64.523
    Patrocinador
    This research has been partially financed by the project ABARNET (Agent-Based Algorithms for Railway NETworks optimization) financed by the Spanish Ministry of Economy, Industry and Competitiveness with grant DPI2016-78902-P; the project "Lonja de Impresión 3D para la Industria 4.0 y la Empresa Digital (LONJA3D)" funded by the Regional Government of Castile and Leon and the European Regional Development Fund (ERDF, FEDER) with grant VA049P17; and the project "Nuevos modelos computaciones en Ingeniería de organización: Sistemas de Soporte a la decisión basados en Agente (SSDBA)" with reference INSISOC-FUNGE/063/160011
    Version del Editor
    https://www.revistadyo.es/DyO/index.php/dyo/article/download/523/544
    Idioma
    eng
    URI
    https://uvadoc.uva.es/handle/10324/65385
    Tipo de versión
    info:eu-repo/semantics/publishedVersion
    Derechos
    openAccess
    Aparece en las colecciones
    • DEP53 - Artículos de revista [97]
    Mostrar el registro completo del ítem
    Ficheros en el ítem
    Nombre:
    523-1071-1-SM.pdf
    Tamaño:
    264.9Kb
    Formato:
    Adobe PDF
    Thumbnail
    Visualizar/Abrir

    Universidad de Valladolid

    Powered by MIT's. DSpace software, Version 5.10