• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Parcourir

    Tout UVaDOCCommunautésPar date de publicationAuteursSujetsTitres

    Mon compte

    Ouvrir une session

    Statistiques

    Statistiques d'usage de visualisation

    Compartir

    Voir le document 
    •   Accueil de UVaDOC
    • PUBLICATIONS SCIENTIFIQUES
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Voir le document
    •   Accueil de UVaDOC
    • PUBLICATIONS SCIENTIFIQUES
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Voir le document
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:https://uvadoc.uva.es/handle/10324/66572

    Título
    Simulation-Based Approach for Multiproject Scheduling Based on Composite Priority Rules
    Autor
    Álvarez-Campana Rodríguez, Pablo
    Villafáñez Cardeñoso, Félix AntonioAutoridad UVA
    Acebes Senovilla, FernandoAutoridad UVA Orcid
    Poza Garcia, David JesúsAutoridad UVA Orcid
    Año del Documento
    2024
    Descripción
    Producción Científica
    Documento Fuente
    International Journal of Simulation Modelling, 2024, vol. 1, p. 29-40.
    Résumé
    This paper presents a simulation approach to enhance the performance of heuristics for multiproject scheduling. Unlike other heuristics available in the literature that use only one priority criterion for resource allocation, this paper proposes a structured way to sequentially apply more than one priority criterion for this purpose. By means of simulation, different feasible schedules are obtained to; therefore, increase the probability of finding the schedule with the shortest duration. The performance of this simulation approach was validated with the MPSPLib library, one of the most prominent libraries for resource-constrained multiproject scheduling. These results highlight the proposed method as a useful option for addressing limited time and resources in portfolio management.
    ISSN
    1726-4529
    Revisión por pares
    SI
    DOI
    10.2507/IJSIMM23-1-667
    Patrocinador
    The authors wish to acknowledge to MCIN/AEI, Spanish Government, and to /10.13039/501100011033/FEDER UE, European Union, for the partial support through the PID2022-137948OA-I00 Research Project. This research has been partially financed by the Regional Government of Castile and Leon (Spain) and the European Regional Development Fund (ERDF, FEDER) with grant VA180P20.
    Version del Editor
    https://www.ijsimm.com/Full_Papers/Fulltext2024/text23-1_667.pdf
    Idioma
    spa
    URI
    https://uvadoc.uva.es/handle/10324/66572
    Tipo de versión
    info:eu-repo/semantics/publishedVersion
    Derechos
    openAccess
    Aparece en las colecciones
    • DEP53 - Artículos de revista [97]
    Afficher la notice complète
    Fichier(s) constituant ce document
    Nombre:
    text23-1_667.pdf
    Tamaño:
    531.2Ko
    Formato:
    Adobe PDF
    Thumbnail
    Voir/Ouvrir

    Universidad de Valladolid

    Powered by MIT's. DSpace software, Version 5.10