• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Ricerca

    Tutto UVaDOCArchiviData di pubblicazioneAutoriSoggettiTitoli

    My Account

    Login

    Estadísticas

    Ver Estadísticas de uso

    Compartir

    Mostra Item 
    •   UVaDOC Home
    • PRODUZIONE SCIENTIFICA
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Mostra Item
    •   UVaDOC Home
    • PRODUZIONE SCIENTIFICA
    • Departamentos
    • Dpto. Organización de Empresas y Comercialización e Investigación de Mercados
    • DEP53 - Artículos de revista
    • Mostra Item
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:https://uvadoc.uva.es/handle/10324/84253

    Título
    Project Tightness (PT): A Complementary Topological Indicator for Explaining Project Schedule Behaviour
    Autor
    Acebes Senovilla, FernandoAutoridad UVA
    Tao, Liangyan
    Sobrino García, ManuelAutoridad UVA
    Pajares Gutiérrez, JavierAutoridad UVA Orcid
    Año del Documento
    2026
    Documento Fuente
    Proceedings of the PMS2026 Conference (pp. 84–87).
    Abstract
    The paper introduces Project Tightness (PT) as a topological indicator that captures the temporal tension of project networks and complements the traditional Series–Parallel (SP) index. Through simulation studies, the results show that PT helps explain differences in variance propagation and control performance among projects with similar structures. Overall, combining PT and SP provides a more complete understanding of project behaviour under uncertainty.
    Palabras Clave
    Network Topology
    Revisión por pares
    SI
    Patrocinador
    This project has been partially funded by the Regional Government of Castile and Leon (Spain) under the Regional Accredited Research Groups Support Program, with grant VA042G2
    Version del Editor
    https://pms2026.sciencesconf.org/data/book_pms2026_en.pdf
    Idioma
    spa
    URI
    https://uvadoc.uva.es/handle/10324/84253
    Tipo de versión
    info:eu-repo/semantics/publishedVersion
    Derechos
    openAccess
    Aparece en las colecciones
    • DEP53 - Artículos de revista [138]
    Mostra tutti i dati dell'item
    Files in questo item
    Nombre:
    Project Tightness (PT)_pms2026.pdf
    Tamaño:
    369.8Kb
    Formato:
    Adobe PDF
    Thumbnail
    Mostra/Apri
    Attribution-NonCommercial-NoDerivatives 4.0 InternacionalLa licencia del ítem se describe como Attribution-NonCommercial-NoDerivatives 4.0 Internacional

    Universidad de Valladolid

    Powered by MIT's. DSpace software, Version 5.10