• español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Listar

    Todo UVaDOCComunidadesPor fecha de publicaciónAutoresMateriasTítulos

    Mi cuenta

    Acceder

    Estadísticas

    Ver Estadísticas de uso

    Compartir

    Ver ítem 
    •   UVaDOC Principal
    • PRODUCCIÓN CIENTÍFICA
    • Departamentos
    • Dpto. Ingeniería de Sistemas y Automática
    • DEP44 - Artículos de revista
    • Ver ítem
    •   UVaDOC Principal
    • PRODUCCIÓN CIENTÍFICA
    • Departamentos
    • Dpto. Ingeniería de Sistemas y Automática
    • DEP44 - Artículos de revista
    • Ver ítem
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis

    Citas

    Por favor, use este identificador para citar o enlazar este ítem:http://uvadoc.uva.es/handle/10324/37900

    Título
    Potential and analysis of an osmotic power plant in the Magdalena River using experimental field-data
    Autor
    Salamanca Parra, Jacobo ManuelAutoridad UVA
    Álvarez Silva, Óscar
    Tadeo Rico, Fernando JuanAutoridad UVA Orcid
    Año del Documento
    2019
    Descripción
    Producción Científica
    Documento Fuente
    Energy 2019 vol. 180 p. 548-555.
    Resumen
    The Magdalena River mouth in Colombia is studied as a candidate site for a renewable power plant via osmotic energy technology, using pressure retarded osmosis. This power generation plant would operate through the controlled mix of two flows with different salinities (river water and seawater in this case study). A preliminary design of a pressure retarded osmosis power plant is proposed here by means of experimental data acquisition on-site at the river mouth. The obtained net power production is shown to reach 6 MW, with adequate membrane power densities above 5 W/m2. These promising results consider energetic losses involved in the process, which have been further analysed to propose improvement targets in pretreatment processes and membrane permeability.
    ISSN
    0360-5442
    Revisión por pares
    SI
    DOI
    10.1016/j.energy.2019.05.048
    Patrocinador
    Spanish Ministry of Economy through the project DPI2014-54530-R and the predoctoral grant BES-2015-073871, by the Junta de Castilla y León and European Regional Development Fund, UIC 233, and by the Banco Santander Iberoamérica Research Grants program. Field data acquisition was funded by COLCIENCIAS -Department of Science, Technology and Innovation of Colombia- by the project: 121571451074, resolution 881 – 2015.
    Version del Editor
    https://www.sciencedirect.com/science/article/pii/S0360544219309119
    Propietario de los Derechos
    Elsevier
    Idioma
    eng
    URI
    http://uvadoc.uva.es/handle/10324/37900
    Tipo de versión
    info:eu-repo/semantics/acceptedVersion
    Derechos
    restrictedAccess
    Aparece en las colecciones
    • IPS - Artículos de revista [156]
    • DEP44 - Artículos de revista [78]
    Mostrar el registro completo del ítem
    Ficheros en el ítem
    Nombre:
    Salamanca_Alvarez-Silva_Tadeo__V7.pdf
    Tamaño:
    558.8Kb
    Formato:
    Adobe PDF
    Thumbnail
    Visualizar/Abrir

    Universidad de Valladolid

    Powered by MIT's. DSpace software, Version 5.10